Product Summary: As China’s energy structure evolves and environmental protection efforts intensify, the development and utilization of n...
86-0515-83664888

Product details

As China’s energy structure evolves and environmental protection efforts intensify, the development and utilization of natural gas have rapidly advanced. Compressed natural gas (CNG) involves purifying and compressing wellhead or pipeline natural gas for high-pressure storage and transportation, delivered to usage sites where it is depressurized through multi-stage heat exchange before being directly input into the supply network for various users.

Economic Scope and Supply Capacity:

The CNG pressure reduction station is economically viable within 300 kilometers, generally not exceeding 500 kilometers, suitable for supplying 2000-4000 households with a gas supply volume of 200-5000 Nm3/h. Too large or too small a volume increases the unit cost of gas consumption.

This system involves smaller investment scales and shorter construction periods compared to long transmission pipelines, providing quick capital recovery. It can also serve as a peaking and backup gas source for long transmission pipelines in the future.

Process Overview:

The working principle of a compressed natural gas pressure reduction station involves high-pressure natural gas from skid-mounted tanks being preheated, progressively depressurized, and undergoing safety control, metering, odorization, and other processes to achieve pressure levels that meet regulatory standards for pipeline transmission. Pressure adjustment can be implemented as two-stage or three-stage regulation.

Structural Overview:

The compressed natural gas pressure reduction station is divided into the following functional sections based on the layout and functions of the equipment:

Unloading System: 

High-pressure hoses, quick-connect couplings, high-pressure valves.

Pressure Regulation and Heat Exchange System: High-pressure emergency cutoff valves, heat exchangers, regulators, vent valves.

Flow Metering System: Flow meters.

Control System: Central control console.

Heating System: Gas boilers, hot water pumps, etc.

The high-pressure natural gas from the skid-mounted tanks first enters the pressure regulation and heat exchange system through the unloading system. Inside, it undergoes two heat exchanges and two or three pressure reductions before entering the flow metering and odorization system, and finally into the distribution network. The heating system provides the necessary heat for the gas pressure reduction process, while the control system monitors the entire system.

Pressure Regulation Process:

Two-stage Regulation Process: Initially, high-pressure hoses and quick-connect couplings connect to the skid-mounted tankers. Compressed natural gas passes through ball valves and high-pressure cutoff valves into a primary heat exchanger where the gas is heated, then through a primary regulator to reduce pressure to 1.0-4.0 MPa, followed by secondary heat exchange and regulation down to 0.1-0.4 MPa, metered for flow, and finally odorized before entering the medium-pressure network. All stages of gas pressure, temperature, flow, water temperature, critical valve controls, and switching between paths are interlock controlled by the central console.

Three-stage Regulation Process: Similar to the two-stage process, with an additional third stage of pressure reduction to further fine-tune the outlet pressure suitable for the medium-pressure network.

This comprehensive setup ensures efficient, safe, and environmentally friendly distribution of natural gas to various consumers.

Product
Gas Pressure Regulator
Gas Pressure Regulating Box
Gas Pressure Regulating Station (Skid)
CNG Pressure Reduction Skid
LNG Vaporization Station (Skid)
LNG Refueling Station
CNG Filling Station
PLC Control System
About us
Company introduction
Production workshop
Corporate Culture
Case show
Customer Cases
Installation Site
Contact us

Jiangsu Dachang Gas Equipment Co., Ltd.

Phone: 86-0515-83664888

Fax: 86-0515-83664666

Email: dcgas@cndcgas.com

Address: Liuzhuang Industrial Park, Dafeng District, Yancheng City, Jiangsu Province

Copyright:Jiangsu Dachang Gas Equipment Co., Ltd. Filing number:Su ICP Bei 17011481
主站蜘蛛池模板: 国产成人精品午夜二三区 | 自拍一区在线 | 波多野结衣亚洲一区二区三区 | 日本3级网站 | 五月天亚洲色图 | 狠狠a | 国产中文字幕视频在线观看 | 午夜免费视频网站 | 凸凹视频在线 | 亚洲播播 | 国产a国产片国产 | 深夜国产在线 | 亚洲最新永久在线观看 | 黄色国产 | 97青草| 国产三级黄色毛片 | 日本波多野结衣在线观看 | 天天干天天干天天插 | 国产精品国产精品国产三级普 | 在线视频精品一区 | 天天干天天综合 | 日本a级精品一区二区三区 日本a级黄 | 亚洲天堂视频在线播放 | 四虎国产成人免费观看 | 天天操天天干天天插 | 五月天婷婷视频在线观看 | 国产精品久久久久9999高清 | jizzxxx欧美| 国产精品30p | 九九久久香港经典三级精品 | 欧美xxxxhdvideos | 亚洲欧美视频一区二区 | 国产人成 | 97伦理| 黄色网址在线播放 | 国产又色又爽又黄的网站在线一级 | 国产自在线观看 | 波多野结衣家教老师 | 日韩三级不卡 | 经典三级一区二区三区视频 | 91在线精品中文字幕 |