东京一本一道一二三区-动漫av网站免费观看-动漫av在线播放-动漫精品成人免费网站-激情影院费观看-激情影院免费

CNG Pressure Reduction Station

Classification: CNG Pressure Reduction Skid

Release time: 03-30-2024

Number of views: 62

Product Summary: As China’s energy structure evolves and environmental protection efforts intensify, the development and utilization of n...
86-0515-83664888

Product details

As China’s energy structure evolves and environmental protection efforts intensify, the development and utilization of natural gas have rapidly advanced. Compressed natural gas (CNG) involves purifying and compressing wellhead or pipeline natural gas for high-pressure storage and transportation, delivered to usage sites where it is depressurized through multi-stage heat exchange before being directly input into the supply network for various users.

Economic Scope and Supply Capacity:

The CNG pressure reduction station is economically viable within 300 kilometers, generally not exceeding 500 kilometers, suitable for supplying 2000-4000 households with a gas supply volume of 200-5000 Nm3/h. Too large or too small a volume increases the unit cost of gas consumption.

This system involves smaller investment scales and shorter construction periods compared to long transmission pipelines, providing quick capital recovery. It can also serve as a peaking and backup gas source for long transmission pipelines in the future.

Process Overview:

The working principle of a compressed natural gas pressure reduction station involves high-pressure natural gas from skid-mounted tanks being preheated, progressively depressurized, and undergoing safety control, metering, odorization, and other processes to achieve pressure levels that meet regulatory standards for pipeline transmission. Pressure adjustment can be implemented as two-stage or three-stage regulation.

Structural Overview:

The compressed natural gas pressure reduction station is divided into the following functional sections based on the layout and functions of the equipment:

Unloading System: 

High-pressure hoses, quick-connect couplings, high-pressure valves.

Pressure Regulation and Heat Exchange System: High-pressure emergency cutoff valves, heat exchangers, regulators, vent valves.

Flow Metering System: Flow meters.

Control System: Central control console.

Heating System: Gas boilers, hot water pumps, etc.

The high-pressure natural gas from the skid-mounted tanks first enters the pressure regulation and heat exchange system through the unloading system. Inside, it undergoes two heat exchanges and two or three pressure reductions before entering the flow metering and odorization system, and finally into the distribution network. The heating system provides the necessary heat for the gas pressure reduction process, while the control system monitors the entire system.

Pressure Regulation Process:

Two-stage Regulation Process: Initially, high-pressure hoses and quick-connect couplings connect to the skid-mounted tankers. Compressed natural gas passes through ball valves and high-pressure cutoff valves into a primary heat exchanger where the gas is heated, then through a primary regulator to reduce pressure to 1.0-4.0 MPa, followed by secondary heat exchange and regulation down to 0.1-0.4 MPa, metered for flow, and finally odorized before entering the medium-pressure network. All stages of gas pressure, temperature, flow, water temperature, critical valve controls, and switching between paths are interlock controlled by the central console.

Three-stage Regulation Process: Similar to the two-stage process, with an additional third stage of pressure reduction to further fine-tune the outlet pressure suitable for the medium-pressure network.

This comprehensive setup ensures efficient, safe, and environmentally friendly distribution of natural gas to various consumers.

Product
Gas Pressure Regulator
Gas Pressure Regulating Box
Gas Pressure Regulating Station (Skid)
CNG Pressure Reduction Skid
LNG Vaporization Station (Skid)
LNG Refueling Station
CNG Filling Station
PLC Control System
About us
Company introduction
Production workshop
Corporate Culture
Case show
Customer Cases
Installation Site
Contact us

Jiangsu Dachang Gas Equipment Co., Ltd.

Phone: 86-0515-83664888

Fax: 86-0515-83664666

Email: dcgas@cndcgas.com

Address: Liuzhuang Industrial Park, Dafeng District, Yancheng City, Jiangsu Province

Copyright:Jiangsu Dachang Gas Equipment Co., Ltd. Filing number:Su ICP Bei 17011481
主站蜘蛛池模板: 亚洲国产毛片aaaaa无费看| 2022亚洲男人天堂| 国产ts在线视频| 国产欧美另类| 日本免费在线看| 婷婷开心色| 中文字幕欧美在线| 久久99精品久久久久久首页| 天天操天天搞| 国产精品久久久久不卡绿巨人| 日本乱码一卡二卡三卡永久| 97色伦图片97综合影院久久| 免费高清毛片天天看| 视频91在线| 国产免费一级精品视频| 日韩欧美在线观看| 国产精品一级毛片不收费| 免费黄色福利视频| 91中文字幕在线| 青青自拍视频一区二区三区| spankchinesegay打屁股| 国产综合在线观看| 青草青草久热精品视频在线网站| 5月丁香婷婷| 欧美另类v| 新版天堂中文资源官网| 黄色网址免费在线播放| 日本欧美三级| 国产理论视频| 亚洲天堂国产| 免费看的黄网站| 97伦理剧| 日韩在线一区二区三区| 好男人www在线社区影院| 日本一区二区视频| 国产三级中文字幕| 亚洲天天网综合自拍图片专区| 毛茸茸成熟亚洲人| 操女模特| 亚洲91视频| 欧美精品影院|